Saturday, 4 April 2009

Model Railway v2.0

Completed the baseboard and electrics for the lower level of my new model railway.

Baseboard is 9mm ply, on a framework made up of 80x9mm ply and 75x25mm softwood.

Electrics are DCC, using an ESU Command Station.

Points use Fulgurex slow-acting point motors, controlled from a home-made panel. This panel uses mini-toggle switches, and has bi-colour LEDs to indicate active lines.

Next stage is to start building the upper level.

No comments: